Vasilefs Georgios - ΒΠ Βασιλεύς Γεώργιος |
|
Career (Greece) | |
---|---|
Name: | Vasilefs Georgios ΒΠ Βασιλεύς Γεώργιος |
Namesake: | King George I of Greece |
Laid down: | 1937 |
Launched: | March 3, 1938 |
Commissioned: | February 15, 1939 |
Fate: | scuttled in April 1941 |
Career (Nazi Germany) | |
Name: | Hermes (ZG 3) |
Commissioned: | March 21, 1942 |
Fate: | scuttled on May 7, 1943 |
General characteristics | |
Displacement: | 1,414 tons standard |
Length: | 97.5 m (320 ft) |
Beam: | 9.7 m (32 ft) |
Draft: | 2.7 m (8.9 ft) |
Propulsion: | 3 Yarrow 3 drum boilers Parsons steam turbines 2 shafts 34,000 shp |
Speed: | 35 knots (65 km/h) maximum |
Range: | 4,800 nautical miles (8,900 km) at 19 knots (35 km/h) |
Complement: | 145 |
Armament: | As completed: 4 × 5-inch (127 mm) guns 4 × 37 mm anti-aircraft guns 2 × 4 21-inch (533 mm) torpedo tubes German refit: 4 × 5-inch guns 4 × 37 mm anti-aircraft guns 4 × 20 mm anti-aircraft guns 2 × 4 21-inch torpedo tubes[1] |
Vasilefs Georgios (Greek: ΒΠ Βασιλεύς Γεώργιος) was a Greek destroyer, the lead ship of its class, which served with the Royal Hellenic Navy and the German Kriegsmarine during the Second World War. The ship was named after King George I, and was the second ship to bear this name.
Contents |
Built by Yarrow & Company (Scotstoun, Scotland) along with her sister ship Vasilissa Olga, she was the most modern ship of the Greek Navy at the outbreak of the Second World War, serving as the flagship of the Destroyer Flotilla. During the Greco-Italian War she operated on convoy escort duty and participated in the first and third naval raids against Italian shipping in the Strait of Otranto (14 November – 15 November 1940 and 4 January – 5 January 1941).
On 14 April 1941 during the German invasion of Greece, while anchored in Sofiko Bay in the Saronic Gulf, she was attacked by German aircraft and suffered severe damage. Under the command of her captain, Commander P. Lappas, she managed to reach the Salamis Naval Yard where she was dry docked. However, due to the rapid German advance and the inability of repairs to be completed on time, she was finally scuttled to prevent capture.
The Germans nonetheless were able to raise and repair her, and commissioned her into the Kriegsmarine as Hermes (ZG 3) on March 21, 1942. She was a well-esteemed ship, and used as the flagship of the German Aegean flotilla, serving mainly in convoy escort duties, under Kapitän zur See Rolf Johannesson. On 16 November 1942 near Cape Kafireas one of these convoys came under attack by the RHN submarine Triton and resulted with the sinking of Triton by one of the escorting vessels.
From April 1943, under Fregattenkapitän Curt Rechel, she was employed in escorting convoys to Tunisia. There she had a success, sinking the British submarine HMS Splendid on April 21. Ten days later however, she was attacked by Allied aircraft off Cape Bon, resulting in 23 dead and heavy damages. She was towed to La Goulette, and scuttled there on May 7, as the Allies entered Tunis.
|